Lac-Leamy Casino in Gatineau
In addition to initial construction, extensive modernization and asset maintenance, including replacement of electrical distribution. BOMA BEST.
© Stéphane Brügger
Lab-École Stadacona in Limoilou
Using BIM and IDP, construction of the first Lab-École in Quebec for the CSS de la Capitale. The school accommodates 400 students in 16 classrooms. LEED v4.
Val-d’Espoir Arena in Mirabel
Construction of a new ice rink and system upgrades. Includes bleachers, locker rooms and concession stand.
© Raphaël Thibodeau
Groupe O’Drey – 1465 Monseigneur-Plessis
Construction of a 7-storey building (80 apartments), including 40 units for people with reduced mobility. AccèsLogis Québec, Novoclimat, NHCF.
© Lafond Côté architectes
Val-Martin Housing in Laval
Modernization of 124 housing units, construction of 357 social housing units and a community centre. Novoclimat, Regénération, AccèsLogis, LEED-NC Gold.
HEC Montréal – Hélène-Desmarais Building
Using BIM and IDP, construction of the downtown building housing the École des dirigeants, the MBA program, and a research centre. LEED Gold.
© HEC Montréal
Collège Notre-Dame Sports Complex
Construction with numerous windows, including two gymnasiums, a running track, sports fields, locker rooms, and a green roof.
© Adrien Williams
Revenu Québec Data Centre
Upgrade of electromechanical and IT/telecom infrastructure, including major ITC capacity increase for RQ and Industrielle Alliance.
© Stephane Groleau