National Bank Head Office
Construction of a 46-storey AAA office building in Montréal to accommodate 10,000 employees. LEED v4, WELL, IDP and advanced BIM.
SQI – Secondary school in Mirabel
Construction of a 4-storey school for over 1,280 students, including 50 classrooms, two gymnasiums, and an atrium. BIM, IDP, LEED v4 Silver.
© Consortium Lemay | Leclerc architectes | Vincent Leclerc Architecte inc.
Industrielle Alliance offices, Quebec City
Retrofit of the offices at 1080 Grande-Allée based on the Work-from-Anywhere policy for modern and flexible spaces. LEED-EBOM and WELL.
© Stéphane Groleau
Entosystem factory in Drummondville
Construction of a plant to convert organic waste into insect-based protein flour, reducing food waste.
© Entosystem
SQI – Secondary school in Laval
Construction of a 4-storey school for over 2,000 students, including 81 classrooms and a two-storey gymnasium. BIM, IDP, LEED v4 Silver.
© Consortium Lemay | Leclerc architectes | Vincent Leclerc Architecte inc.
La Pêche Town Hall
Energy-efficient solid wood construction, on track to be the first Passivhaus institutional building in Quebec.
© BGLA | Architecture + Design Urbain
Agora des Arts in Rouyn-Noranda
Retrofit and update of a century-old church and rectory to house a theatre and music centre.
Hôtel de Glace in Valcartier
Annual temporary construction of the only ice hotel of its kind in North America, including 30 rooms, a chapel, an ice bar and recreational areas.
© Village Vacances Valcartier